Project Overview
A luxury mixed-use resort development on 7.6 hectares of prime oceanfront land within the Mandalika Resort Community — a 1,200-hectare Special Economic Zone (SEZ) on Lombok's south coast.
514
Total Keys
7.6
Hectares
180m
Beachfront
1,200
Hectares SEZ
5+ Star Hotel
204 Keys
5 Star Hotel & Villas
110 + 14 Villas
Residences
100 Units
Media
Developer
Indonesian American Resorts Company (IARCO) has acquired a 7.6 hectare prime oceanfront site within the Mandalika Resort Community on the dramatic south coast of Lombok Island. A joint venture between EBD Paragon Singapore Pte Ltd (60%) and PT PP Properti (40%).
Positioned to be among the first operational luxury branded resorts in Mandalika
Innovative design featuring lodging, residential, recreational, dining, and shopping choices
180 meters of pristine sandy beach oceanfront, 350 meters deep
April 29, 2016
Photos from the Groundbreaking Ceremony
Accommodation
204 luxury rooms and suites featuring contemporary tropical architecture with stunning ocean views and world-class amenities.
204 Keys
110 premium rooms plus 14 exclusive villa suites, offering the highest level of tropical luxury with personalized services.
110 Rooms + 14 Villas
100 exclusive residential units with 1, 2, and 3 bedroom options. Private beach access and resort amenities.
100 Units (200 Allowable)
Total Development
514 Keys
Mixed-use resort featuring hotels, villas, and residences
Design Concept
Sasak Architecture | Design | Heritage — Celebrating Lombok's rich cultural legacy through sustainable tropical design.
Lombok lies immediately east of Bali. Pile-built, bonnet-rice barns known as lumbung are the pride of Sasak vernacular architecture. The Mandalika Beach Resort & Residences Concept Design celebrates this iconic shape and cultural heritage.
Inspired by the Lombok International Bamboo Architecture Festival, our design incorporates bamboo — "almost forgotten in its potential as a local Indonesian material." The event was attended by over 300 architects from around the world.
Lombok is known for its traditional weaving and fabrics, thriving pottery industry, and beautiful limestone carvings. The Concept Design incorporates the best of these handcrafts throughout the resort.
A
5 Star Hotel
B
Eco-Adventure Center
C
5+ Star Hotel
D
Retail & Entertainment
E
Lobby & Restaurant
I
Paramount Residences
P
Main Pool & Swim-up Bar
R
Water Park
Project Phasing & General Site Plan
Fourth Floor Plan - Lagoon Villas & Waterpark
Master Plan
Lot H3 (6.05 hectares) features 150m width road side, 135m beach front, and 300-350m depth. Lot G4 (1.50 hectares) adds dedicated greenspace following Monkey Mountain.
Project Phasing & General Site Plan
Resort Facilities & Water Features
5-Star Hotel
Main arrival experience
5+ Star Hotel
Premium accommodation
Main Pool
Beachfront swim-up bar
Lagoon
Connected water taxis
Location
Nestled on the serene south coast of Lombok, within the prestigious Mandalika Special Economic Zone. A destination where pristine beaches meet world-class luxury.
20 minutes from Lombok International Airport
180 meters of pristine sandy beachfront
Adjacent to 320-room Pullman Hotel
Near Grand Lagoon with eco-adventure access
Lots H3 & G4 — Mandalika SEZ, Lombok, Indonesia
Experience the pinnacle of luxury oceanfront living. Contact us today to discover more about this extraordinary development opportunity.
Schedule a ConsultationContact
PT Perusahaan Resort Indonesia Amerika (IARCO)
Lots H3 & G4, Kawasan Ekonomi Khusus Pariwisata Mandalika
Address
Kuta, Pujut, Lombok Tengah
Nusa Tenggara Barat, Indonesia
Partners
Partners
EBD Paragon Singapore
EBD Bauer
PT PP Properti
Headquarters
111 North Bridge Rd
Peninsula Plaza, 179098
Singapore
www.ebdparagon.com
U.S. Office
19800 MacArthur Blvd
Irvine, CA 92612
United States
www.ebdbauer.com
Head Office
Plaza PP – Lantai 7
Jl. Letjend. TB. Simatupang No. 57
Pasar Rebo, Jakarta 13760
www.pp-properti.com